Rent aerial work platforms and construction machinery in Karvina

Rent aerial work platforms and construction machinery in Karvina

Aerial work platforms and construction machinery are needed in Karvina today mainly for projects that bring something to an end and prepare something new. Hard coal mining is being phased out, and with it headframes, processing plants, workshops and ancillary buildings are being dismantled; the released areas are moving into reuse and conversion. That is a construction task in its own right: dismantling before demolition, hazardous materials before structural work, and a subsoil whose load-bearing capacity has been shaped by mining.

Demolition in the right order: dismantle first, then demolish

Industrial dismantling does not begin with the excavator, but at the top and by hand. Cable routes, pipework, drives, sheaves and conveyor equipment are unhooked, separated and lowered individually before the load-bearing structure is touched.

For this phase, reach on slender, tall structures is what counts. Telescopic boom lifts reach 14.00 to 56.90 m working height — the highest figure in the rental fleet — and get to headframes, bunkers, silos and chimneys. Where the base point is obstructed, articulated boom lifts with 10.89 to 48.15 m reach the working point horizontally via the articulated arm.

In interior demolition the working heights are lower, but the loads are higher: dismantling tools, cut-off grinders, temporary supports and components all go up as well. Diesel scissor lifts with 9.70 to 34.00 m and platform capacities up to 1,134 kg are the most load-bearing class for this; in poorly ventilated areas electric scissor lifts with up to 33.00 m and 1,000 kg take over.

Subsidence area: load-bearing capacity comes before equipment selection

Decades of underground mining have visible consequences at the surface. Mining subsidence, waterlogged zones, backfilled shafts, old foundations and culverts beneath filled ground determine where a machine may stand at all. The impression given by machine weight is misleading: when the machine is set down on outrigger pads, point loads act instead of area loads.

A practical order of work: evaluate the existing records and the subsidence forecast, define the set-up points, dimension the load distribution — and only then choose the equipment class. Where the ground is not reliably load-bearing, tracked spider lifts with 13.00 to 39.50 m are the alternative: crawler undercarriage, the lowest ground pressure in the range, narrow transport width. On paved but uneven surfaces — slag ballast, old concrete slabs, remains of track — the rough-terrain versions of the diesel scissor lifts with all-wheel drive are the more robust choice.

The rental fleet in figures

ClassWorking heightPlatform capacity
Scissor lifts, electric6.30 – 33.00 m227 – 1,000 kg
Scissor lifts, diesel9.70 – 34.00 m363 – 1,134 kg
High-rack scissor lifts18.50 – 33.00 m450 – 1,000 kg
Articulated boom lifts10.89 – 48.15 m150 – 450 kg
Telescopic boom lifts14.00 – 56.90 m227 – 454 kg
Vertical mast lifts10.00 – 12.65 m200 kg
Tracked spider lifts13.00 – 39.50 m200 – 400 kg

Excavators from 1.8 to 30 t working alongside the platform

Demolition projects rarely call for a single machine size, but for a graded line-up. Excavators are available from 1.8 t to 30 t operating weight, with the intermediate classes 3.5 t, 5 t, 8.5 t, 14 t and 23 t. The 1.8-tonne machine works in interior demolition and fits through hall doors; the 23- and 30-tonne machines handle demolition of the load-bearing structure, foundation excavation and bulk earthmoving.

It makes sense to think of platform and excavator as a pair: while dismantling is under way above, the small excavator stands below for removal and sorting; as soon as the structure is clear, the task moves to the large class. Telehandlers take over material transport without a crane: rigid models with 4.30 to 18.80 m lift height and 1.25 to 25 t capacity, roto models with 15.42 to 38.90 m for set-up points that require 360-degree operation. For handling on unpaved ground there are rough-terrain forklifts.

New build on the brownfield site: site services, hall, facade

After demolition comes bringing the site back into use: access and site services, pipe and cable laying, foundations, hall construction, outdoor areas. The equipment requirement turns around in the process — away from dismantling and load capacity, towards reach and installation height. In steelwork and when fitting wall and roof elements, articulated and telescopic boom lifts work in parallel with the telehandler, which lifts the elements to the installation point.

For cabling, lighting and building services under the roof, the electric scissor lifts are the right class, supplemented by high-rack scissor lifts with 18.50 to 33.00 m once the racking system is in place. Interior fit-out in areas that stay in use is covered by vertical mast lifts with 10.00 to 12.65 m. Because the equipment classes change from one phase to the next, it is worth planning across the construction phases rather than making a separate enquiry for each trade.

Inspection records and operator duties in the Czech Republic

The law of the country of use applies. For the Czech Republic, government regulation NV 378/2001 Sb. governs the operation and use of machinery and technical equipment, with a dedicated annex for equipment used to lift loads and persons. Testing is carried out to CSN EN 280; the wider framework is the Zakonik prace (262/2006 Sb.) and Zakon 309/2006 Sb. We supply every machine with a valid inspection record, CE documentation and operating instructions; the risk assessment, operator instruction and the check before work starts remain with the operating company.

Demolition projects add a separate strand of permits and records: demolition notification, hazardous materials register, disposal records and, on land affected by mining, additional requirements for structural stability. These points do not concern the rental itself, but they determine the sequence of work and therefore the time windows for the equipment.

Transport to Karvina

Karvina lies around 470 km from our site in Passau, at the far eastern edge of our delivery area. The final leg runs via Ostrava, so assignments in both cities can be scheduled on a single trip. Over this distance, lead time pays off particularly well: booking early gets you the class you actually want rather than a workable alternative. Check the access route in advance — on demolition sites, works roads and gate systems are not always designed for low-loaders. For projects running over several months we bill at long-term rental rates.

Rent aerial work platforms → | Send an enquiry →

Before you enquire, it is worth looking at the designs: at Rent a lifting platform you will find all platform types from the scissor lift to the truck-mounted platform with their strengths, typical applications and operator duties.

Frequently Asked Questions in Karvina

chevronDown

Which access platform can reach a headframe or a tall bunker?

The telescopic boom lift with a working height of up to 56.90 m offers the greatest reach in our rental fleet and works on slender, tall structures from a single set-up position. This requires a load-bearing, paved area with enough room for the outriggers. If the base point is obstructed by annexes or foundations, the articulated telescopic boom lift with 48.15 m brings the basket horizontally to the work point.

How do I handle mining subsidence and backfilled shafts when setting up?

Clarify the load-bearing capacity and the history of the ground before you choose the machine, not afterwards. When the machine is supported on outrigger pads, point loads act on the ground instead of distributed loads, so load spreader plates must be planned in from the outset. Where the surface is not reliably load-bearing, a tracked access platform with a crawler undercarriage is the more robust solution.

Which excavator sizes do I need for dismantling and the subsequent demolition?

A graduated range rather than a single size. The 1.8-tonne machine works in interior demolition and fits through hall doors, the 3.5 to 14 t classes take on sorting, utility line and foundation work, and the 23- and 30-tonne machines handle the demolition of the load-bearing structure and bulk excavation.

Can an access platform and an excavator work on the same area at the same time?

Yes, provided that working areas and haul routes are kept separate and the platform's set-up points are protected against being struck. In practice this is the normal case: dismantling above, removal below. Position the outrigger points so that the excavator does not have to cross them.

Does the choice of equipment change once new construction starts on the site?

Considerably. In the deconstruction phase, load capacity and off-road capability are what count; for new construction it is reach and installation height: articulated telescopic and telescopic boom lifts for the steelwork and facade, telehandlers for the structural elements, and electric scissor lifts and vertical mast lifts for fit-out and building services work in the completed hall.